The Dead Sea is drying up, with severe negative consequences on the ecosystem, industry and wildlife in the area. The Red-Dead Conveyance project is designed to move Red Sea water from the Gulf of Aqaba through a pipeline/canal conveyance approximately 180 kilometers to the Dead Sea. Since the Dead Sea is some 410 meters below sea level and the Gulf of Aqaba is at sea level, water dropping through that 410 meters of elevation can be used to generate hydropower, and the power can be used to desalinate a portion of the Red Sea water. [ Sounds like a cool project, if those unknowns get answered... -k] The Red-Dead Conveyance Project |